News Flash

Home

Posted on: August 21, 2019

Fall Paving List

Press Release 

ROAD RESURFACING & ROADWAY REPAIRS 

August 21, 2019

The City of Bristol is scheduled to start its fall 2019 roadway resurfacing program on Monday, August 26, 2019. As part of the program, the following streets will be milled and resurfaced:

  • Birge Road
  • Jennings Road
  • Lardner Road
  • Boy Street
  • Maxine Road
  • Elaine Drive
  • French Street
  • Milton Road
  • Jewel Street
  • Minor Street
  • Knob Hill Lane
  • Nutmeg Road
  • Ludlow Court 
  • Old Wolcott Road
  • Ipswitch Road
  • Salem Lane
  • Redstone Street

The work will be completed in two phases. The initial phase will consist of milling off the existing bituminous pavement of the road. The second phase will consist of installing a new bituminous roadway surface and will commence shortly after phase one. Once construction is complete, the City will repair any damaged driveway aprons.

There may be minor traffic delays during construction, however the road will remain open for mail delivery, emergency vehicles, and local traffic at all times. Temporary “No Parking” signs will be posted as needed during construction.

If you should have questions or concerns about this project, please feel free to contact Public Works Engineering Division at 584-6125.

Facebook Twitter Email