Shared Engineering Documents
Available Information
Connecticut Department of Transportation Community Connectivity Grant Program (CCGP) funding includes 2 areas of construction work for 2020; Ramp and Sidewalk improvements and Wayfinding Signs. The Preliminary Plans (Not for Construction) are provided below:
Intersection Drawings
City of Bristol Drawings
DOT Traffic Signal Plans
Farmington Oakland
Asplundh Tree Map